2 Operating A&D DataManagement 07/2011
2.4 Specifying the properties of the control components
© Siemens AG 2011 All Rights Reserved
2-64 SIMATIC A&D DataManagement Client - 07/2011
S7 progr. path
Reference to the STEP7 project path under which the STEP7 project is
stored along with the DriveES drive that was configured there.
Max. no of
The maximum permissible number of backups is specified here.
S7 project path
DriveES manages the drives connection data in a Step7 project. To
transfer the data, therefore, ADDM requires a reference to the
corresponding S7 project.
Select the S7 project in the S7 browser"s Open dialog.
Using the "Browse…” button, assign the storage path of the corresponding
source project.
The reference is saved in ADDM by selecting a parameter set in the right-
hand display area.
The browser then closes automatically.
Delete path
Deletes the S7 project path.