
07/2011 2 Operating A&D DataManagement
2.3 Assigning control components
© Siemens AG 2011 All Rights Reserved
SIMATIC A&D DataManagement Client - 07/2011
2-33
Project – Consistency check upon project start
When opening a project, all file and directory entries are checked within the project.
The files in the directory or directories are analyzed.
The following screen is displayed if files are existing, but not the relevant
directories.
You can choose whether you wish to delete the file or create a corresponding
directory.
Superfluous directories for which there is no file within the project are deleted.
Disable objects for editing
Before control components can be assigned or changed the area or unit must be
disabled for editing by the user. On creating a new ADDM project the locking
mechanism is done by ADDM automatically. Disabled parts of a project are
displayed in a green colour. Opens another user the same project, the disabled
parts are displayed in red.
Komentarze do niniejszej Instrukcji